Dashboard
Drill Information
Drilling Parameters
Drill Pattern
Man Power & Associated Cost
Drill Media Gallery
Analytics
DTH Pro Extension
Predefined Forms Library
Create Your Own Form
Invoice
Report
Drill Log Report
Daily Activity Report
Visitor Sign In Report
Pre Start Checklist
Search
History
Payroll
Blast Hole Drilling
Blast Hole Drilling
Geo-technical Drilling
Basic Information
Visitors Details
Pre Start Checklist
Drill Details
Activity Details
Drill Accessories
Assessment and Inspection
Confirmation Form
Date
S. No.
Name
Working Hours
Shift
1
Adam
6
Day
Day
;
Swing
;
Night
;
Add New Row
Save & Next
S. No.
Name
Site
Time In
Time Out
Signature
1
John
Pit 4
09:30 AM
06:30 AM
Add New Row
Save & Next
Site
Issues Discussed
Week Commencing
Signature
Save & Next
Hole No.
Start Depth
End Depth
Water Level
Comments
6
5
11
4
Completed.
m
m
m
Add New Row
Total Meterage Drilled
Save & Next
S. No.
Activity
Start Time
End Time
Comments
1
Safety Meeting - Client
11:30 AM
01:45 PM
Everything is Well.
Travel (To / From Rig)
;
Safety Meeting - Client
;
Pre Start Service
;
Collar Hole
;
Drilling
;
Run / Full Rods / EOH
;
Pack Up / Set Up
;
Move Rig
;
Conditioning Hole
;
Bit Change
;
Re-Entry
;
Casing In / Out
;
Reaming
;
Standby
;
Stuck Roads / Fishing
;
Tool Box Talk
;
Maint/Repairs - Breakdown
;
Maint/Repairs - Planned
;
Survey
;
Weather Events
;
Add New Row
Save & Next
DTH Drill Details
S. No.
Description
Cost
Qty
1
Drill Bits
500
2
Bit Shanks
Drill Bits
Drill Pipes
Hammers
Add New Row
Fuel Consumption
S. No.
Fuel Used
Asset #
1
Booster Truck
50
Rig
Supplied Truck
Booster Truck
Booster
LV
Water Truck
Lighting Plant
Add New Row
Materials Used
S. No.
Accessories
Values
1
Cement - Grout (Bags)
7
B/Mix Cement (Bags)
K2-7/14 (Bags)
Cement - Grout (Bags)
Bentonite (Bags)
Sand (Bags)
Filter Sock (Metres)
Core Boxes (Number)
Drilling Mud (Kg)
Add New Row
S. No.
Accessories
Size
Meters
1
Casing
4
6
Diamonds
Tungsten
Open Barrel
Casing
Wash Drill
PVC Blank
PVC Screen
Air Hammer
Add New Row
S. No.
Accessories
Number
1
SPL
4
PVC Screw Caps
PVC Eng Caps & Joiner
SPT
Push Tube
Packer Test
Toby Flush / Standup
Toby Stand Up
Accommodation
Add New Row
Tools Inventory
S. No.
Tools
Cost
Qty
1
DRILLING JAR
1266
1
2
STABILIZER
300
1
3
NON-MAG DRILL COLLAR (NMDC)
88
7
Add New Row
Save & Next
S. No.
Hazard
Risk
Significant
Eliminate Isolate Minimise
What Controls to Reduce Risk ?
Actioned By
1
Low
Yes
Low
Medium
High
Yes
No
Add New Row
S. No.
Rig
Result
1
Spill kit on site
Pass
Emergency switches
First aid kit / sunscreen / eyeflush
Spill kit on site
Rig engine hydraulic hoses not leaking
Drill string straight and no cracks
SPT hammer in good condition no fatigue
Tracks on rig not worn and free of debris
Fuel stored in approved containers
Pump lines have no leaks and secured
Pass
Fail
N/A
Yes
No
Add New Row
Save & Next
Client Name
Driller Name
Take 5's
Client Signature
Driller Signature
Hazard Id
Save & Next